The Future of The Hub

A red brick building with white columns and a pediment, surrounded by trees with autumn leaves, and a green lawn with people sitting and walking in a park-like setting.

Learn more about The Hub’s plans to transform the Gary Library space into a fully equipped, professional performing arts center — complete with classrooms, rehearsal spaces, a flexible stage to serve all corners of our community, and a vibrant community gathering space.

All designs and renderings are from our incredible architects at Freeman French Freeman.

Key Features of the Main Floor:

  • Intimate café/event lobby with indoor and outdoor seating

  • Front patio with a new ramp and outdoor seating for café

  • Flexible performance area featuring:

    • full ceiling lighting grid, LED stage lights and controls, ADA compliant assistive listening system, removable tiered audience seating, integrated sound system, and improved acoustics

  • Catering prep kitchenette

  • Brand new bathrooms including ADA single stall bathroom

  • Elevator and new staircase

Key Features of the Basement:

  • Three educational classrooms and rehearsal studios

  • Green room lounge and dressing room for teaching artists and performers

  • Rear parking lot and drop-off entrance with ramp

  • Reception area complete with cubbies

  • Brand new bathrooms with ADA single stall bathroom and shower

  • Elevator and new staircase

  • Full building updates including new HVAC system, flooring, paint, and security system

SUPPORT US

Consider making a donation today to help us make these renovations possible!

4% Cover the Fee